Access the Full Project by Clicking here!
Bidjugde
JOB
Milan Stanley Lift Station Replacement
BID DATE
04/17/23 - 1:00
AGENCY
Milan
ESTIMATE
n/a
SCOPE
: Installation of new sewage lift station with an appurtenant valve vault, approximately 115 linear feet of new 8-inch sewer force main, and approximately 120 linear feet of 10-inch gravity sewer main. The new lift station shall be equipped with new dual submersible pumps with new controls, piping, check valves, and floats. Extension of 3-phase power to the site is to be coordinated with Continental Electric Divide Electric Cooperative. The new gravity sewer main will connect to and extend from an existing sewer line, and feature two (2) new manholes. Installation of the new force main includes a new pressurized cleanout and the connection to an existing force main to connect the new lift station to the Village’s municipal sewage collection system. https://www.wilsonco.com/plan-room/village-milan-stanley-lift-station-replacement vvvv lizzie.crumley@wilsonco.com
UPDATES