2023 Ahwahnee Drive Complete Utility Pavement Rehabilitation
BID DATE
04/6/23 - 2:00
AGENCY
Millbrae
ESTIMATE
n/a
SCOPE
The project consists of the upsizing approximately 1,800 linear feet of an existing 6-inch vitrified clay pipe to 8-inch-high density polyethylene pipe using the pipe bursting and open-cut/trenching method, reconnection of existing sewer laterals, and sewer manhole rehabilitations. Additionally, approximately 1,700 linear feet of new 8-inch water main will be installed in the roadway area (existing water main at the existing back of walk) which will include installation of valves, fittings, thrust blocks, as well as reconnection of the existing meter and hydrant laterals to the new main line. This project includes street light improvements which include installation of street light foundations, poles, LED fixtures, and pull boxes as well as running new conduit and wire within the roadway. Finally, the approximately 1,600 linear foot segment of Ahwahnee Drive shall undergo pavement rehabilitation, including grinding of existing pavement, recompacting the existing aggregate base/subbase, installing hot mix asphalt, constructing ADA curb ramps, sidewalk, curb, and gutter. Armando Mora,650-259-2393,amora@ci.millbrae.ca.us https://pbsystem.planetbids.com/portal/46991/bo/bo-detail/103217#bidInformation
PREBID
3/22/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT