Access the Full Project by Clicking here!
Bidjugde
JOB
Cycle 2 Street Resurfacing Encompassing Agnes Road 27th 29th Streets
BID DATE
03/15/23 - 11:00
AGENCY
Manhattan Beach
ESTIMATE
$1,350,000
SCOPE
The Manhattan Beach Cycle 2 Street Resurfacing Project is a Public Works construction project including, but not limited to, reconstructing several street segments. The following street segments are included in the Base Bid: (1) 27th St. from Laurel Avenue to Pacific Avenue (approximately 240 LF); (2) Agnes Rd. from 29th St. to Marine Ave (approximately 870 LF); and (3) 29th St. from Blanche Rd. to Agnes Rd (approximately 1,130 LF). The following streets are included as separate Additive Bid Items: (4) Flournoy Rd. from Ardmore Avenue to 19th St. (approximately 380 LF); (5) Flournoy Dr. from Valley Dr. to 33rd St. (approximately 2,630 LF); (6) Marine Ave. from Blanche Rd. to Valley Dr. (approximately 1,270 LF); and (7) 14th St. from Pacific Ave. to Laurel Ave (approximately 300 LF). Five of these segments (Nos. 1, 2, 3, 5 and 6) include construction of rolled curb and gutter and pavement removal and construction. Two segments (Nos. 4 and 7) include milling of the existing pavement surface and placement of a new asphalt rubber surface course over pavement fabric. Other work includes construction of 15 access ramps and a section of new sidewalk (on the west side of Flournoy Rd. from Valley Dr. to 25th St.), including all incidental work described in the contract documents. Harvey Gobas,562-618-3181,hgobas@manhattanbeach.gov https://pbsystem.planetbids.com/portal/48136/bo/bo-detail/102370#bidInformation
PREBID
3/6/2023 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT