SCOPE
The project includes construction of approximately six-thousand two-hundred (6,200) linear feet of 8 to 20-inch water line and approximately one-thousand, two-hundred (1,200) linear feet of 8 to 10-inch wastewater line as detailed in the Construction Plans and Specifications. The water lines begin approximately 800 LF north of the intersection with W Red Oak Rd, north along IH 35E until approximately 950 LF south of the intersection with Tater Brown Rd. The sewer line begins at the intersection of IH 35E, east along FM 664 until approximately 250 LF east of the intersection with Ryan Dr. https://www.civcastusa.com/project/640922dc1b7ecbce8d625c84/summary stuart.williams@kimley-horn.com