Access the Full Project by Clicking here!
Bidjugde
JOB
Lincoln Blvd Improvements
BID DATE
12/18/14 - 3:00
AGENCY
Lincoln
ESTIMATE
$1,920,000
SCOPE
The Lincoln Boulevard Phase 1 Improvements Project area is Lincoln Boulevard in downtown Lincoln from approximately 150 feet south of McBean Park Drive to 250 feet north of 7th Street, and includes transitions onto the cross streets at McBean Park Drive, 5th Street, 6th Street and 7th Street. The project includes the following elements: Bulbed out curb returns with enhanced crosswalks, and sidewalks with terra cotta bands; Street trees with irrigation system that includes capacity for expansion for future shrub planting; Site furnishings to include bike racks, benches and trash receptacles; Decorative street lights; Modification of traffic signals at McBean Park Drive, 5th Street and 7th Street to include bicycle loop detectors, LED safety lighting, battery back-up, and emergency vehicle interrupt; Replacement of damaged and non-conforming sidewalks.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT