Access the Full Project by Clicking here!
Bidjugde
JOB
Arroyo Seco Storm Drain Bypass
BID DATE
04/11/23 - 2:00
AGENCY
Millbrae
ESTIMATE
n/a
SCOPE
The work to be performed consists of mobilization, traffic control and construction signage, water pollution control, dust prevention and control, site cleanup, trench excavation, disposal of excavated material, installation of water main, water services, fire services, tracer wire, water valves and boxes, elbows, all related equipment, appurtenances, fittings, backfill, existing facilities removal and abandonment, flushing, testing, and disinfection, pavement restoration, potholing, asphalt concrete removal, asphalt concrete installation, hardscape/landscape restoration, striping replacement, and all other work, complete in place, as specified herein, as shown on the Plans, as specified in the Standard Specifications, Special Provisions, Technical Provisions, and as directed by the Engineer. https://pbsystem.planetbids.com/portal/46991/bo/bo-detail/103211 vvvvv Armando Mora/(650) 259-2393 AMora@ci.millbrae.ca.us
PREBID
3/28/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT