Access the Full Project by Clicking here!
Bidjugde
JOB
Sidewalk Infill Project for Cycle 3 Federal Safe Routes to School Program
BID DATE
12/17/14 - 2:00
AGENCY
Lompoc
ESTIMATE
$300,000
SCOPE
This project includes but is not necessarily limited to the following: Furnishing, hauling, placing, compacting, and grading of material; preparation of subgrade for portland cement concrete (pcc) and hot mix asphalt (HMA); furnishing and constructing ADA compliant pcc sidewalk, curb ramps, curb, curb & gutter, bulb-out, driveways, spandrels; sawcutting, removals, raising and lowering of utility boxes, installation of new water meter boxes, yokes and appurtenances and extension of service lines behind proposed sidewalk, tree removals, finish grading; clean-up and related work as required, to complete the work as specified by the Plans, these Special Provisions, the Standard Plans and Specifications For Public Works Construction ("Greenbook") 2012 edition, and the City Standard Requirements. Alex Ubaldo City of Lompoc Engineering / Public Works 100 Civic Center Lompoc, CA 93436 Tel:(805) 875-8240 Fax:(805) 875-8349 a_ubaldo@ci.lompoc.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT