JOB
Carl Munck ES Asphalt Removal Replacement
BID DATE
04/6/23 - 2:00
AGENCY
Oakland Unified School District
ESTIMATE
$450,000
SCOPE
Scope of work includes but not limited to: Cut, demolish, and excavate approximately 91,340 SF of failed pavement to depth of 3" and transport spoils to recycling center. Compact existing base rock, then sweeting it up with one inch of class II base rock, apply tack oil along perimeter edges, then provide, place and compact 2.5" of 0.5" medium hot-mix asphalt. AC Overlay with Fabric: Alternate in Lieu of R/R Grind/chip perimeter edges of overlay as required for flush transitions, clean pavement surface, fill crack with hot crack filler then apply tack oil, install pavement reinforcement fabric and place and compact 1.5 of" medium hot-mix asphalt on approximately 91,340 SF. After punch list is complete all warranties must be submitted. marcus.board@ousd.org https://www.ipdservices.com/clients/eastbay/?Oakland%20USD&Show=Planroom&Project=OUSD+70025+Carl+Munck+ES+-+Asphalt+Removal+and+Replacement
UPDATES