Midway St Utility Improvements
BID DATE
04/13/23 - 2:00
AGENCY
San Marcos - TX
ESTIMATE
$1,265,000
SCOPE
Includes but is not limited to approximately 2,225 LF new 8-inch diameter PVC wastewater line, 884 LF new 8-inch diameter PVC waterline, 178 LF trenchless installation of 18-inch steel casing, 11 wastewater manholes, 5 gate valves, and associated traffic control and restoration along Midway Street, Perkins Street, Alto Street, Waco Street, Alley A and Alley B. The estimated construction cost is $1,265,000. rshelton@sanmarcostx.gov vvvvv http://sanmarcostx.gov/Bids.aspx?BidID=591
PREBID
3/14/2023 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT