Access the Full Project by Clicking here!
Bidjugde
JOB
Upper Hillcrest Subbasin 4 Pavement Repair
BID DATE
03/31/23 - 2:00
AGENCY
Millbrae
ESTIMATE
n/a
SCOPE
In general, the work to be performed consists of mobilization, traffic control and construction signage, asphalt concrete removal, asphalt concrete installation, asphalt concrete base repair, ADA ramp construction, PCC curb & gutter removal and replacement, PCC driveway apron removal and replacement, PCC sidewalk removal and replacement, miscellaneous concrete repairs, manhole frame and utility cover adjusting and restoring to grade, underground utility location, survey monument protection, striping removal & replacement, raised pavement markers removal and replacement and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer. Armando Mora,amora@ci.millbrae.ca.us ,650-259-2393 https://pbsystem.planetbids.com/portal/46991/bo/bo-detail/103015#bidInformation
PREBID
3/21/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT