Access the Full Project by Clicking here!
Bidjugde
JOB
Sump 87 Diversion Silver Eagle Road Rehabilitation
BID DATE
04/5/23 - 2:00
AGENCY
Sacramento
ESTIMATE
$3,702,000
SCOPE
This work consists of the reconstruction of sanitary sewer facilities and resurfacing of the roadway along Silver Eagle Road, San Juan Rd, and Mable Rd. The Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project in place and make all required connections to the existing sewer system and electrical work as shown on the Plans and as specified herein. The sanitary sewer work to be performed consists of removing an existing 6-inch and 8-inch diameter sewer main in Silver Eagle Road and replacing it with a new 21-inch diameter sewer main sloped in the opposite direction to redirect flows from Mabel Street to the Regional San Natomas 2 Interceptor in Silver Eagle Road. Additionally, the work will also include removing the 21-inch diameter sewer main in Mabel St and replacing it with a new 8-inch diameter sewer main. This work will also include, but is not limited to, manholes, junction structures, sewer services and all other associated work. The street resurfacing work shall include performing pavement keycutting, base repair, shoulder backing, and placing 3-inch of rubberized asphalt concrete overlay. This work also includes adjusting manholes and valve boxes to grade, placing new signing, striping, signal improvements, and all other associated work Marc Lee,mlee@cityofsacramento.org https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/103079#bidInformation
PREBID
3/22/2023 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT