Access the Full Project by Clicking here!
Bidjugde
JOB
Barton Ave 2nd Street Drainage
BID DATE
04/6/23 - 2:00
AGENCY
South Lake Tahoe
ESTIMATE
$1,550,000
SCOPE
Work to be performed includes, but is not limited to: Project sign, traffic control, water pollution control, fugitive dust control, pavement saw-cutting (or grinding), removal and disposal of existing AC pavement, milling of existing AC pavement surfaces, tree removal, construction staking, earthwork grading, off-haul of earthen materials and tree stumps, grading & compaction, new concrete curb, storm drain pipe removal, adjust utilities to grade, water service line relocations, storm drain system construction (drainage inlets, storm drain laterals, storm drain main, storm drain manholes, and treatment basins), sanitary sewer lateral relocations, installation of permeable roadside shoulder area, AC paving, pavement striping and signage, temporary erosion control Best Management Practices, compliance with regulatory permits, establishing revegetation over water quality basin sites, and areas disturbed by construction activity, and all other work as described in the Contract Documents, including, without limitation, project construction drawings, bid documents, Special Provisions, City of South Lake Tahoe Public Improvements and Engineering Standards, and 2018 edition of California Department of Transportation, Standard Specifications. Stan Hill/(530) 542-6039 shill@cityofslt.us vvv https://pbsystem.planetbids.com/portal/14997/bo/bo-detail/102994
UPDATES