Access the Full Project by Clicking here!
Bidjugde
JOB
Long Beach Blvd Street Improvements
BID DATE
04/17/23 - 11:00
AGENCY
South Gate
ESTIMATE
$6,500,000
SCOPE
The Long Beach Boulevard Street Improvements Project proposes safety, traffic circulation, landscaping and greening and beautification improvements, from Santa Ana Street to Tweedy Boulevard. The vision for Long Beach Boulevard is to transform the corridor into an attractive urban environment with a diverse mix use. This will require a significant complete streets improvement program that includes greening the corridor with energy efficient systems, storm water infiltration planters, improved traffic circulation and safety, promoting alternative modes of transportation with enhanced pedestrian mobility and bike amenities, enhanced streetscape environment and other pedestrian environment enhancements. More specifically, project amenities include raised landscaped median islands with drought tolerant vegetation; vegetated bio-filtration swales; storm water capture, treatment and infiltration; roadway pavement rehabilitation and restriping; upgraded pedestrian lighting, high visibility enhanced crosswalks and rectangular rapid flashing beacons; sidewalk repairs and ADA compliant curb ramps; enhanced bus stops; bike racks and striping for class III bicycle facilities. These elements have safety, transportation, beautification, and quality of life benefits. ktang@sogate.org https://www.ebidboard.com/public/projects/showproject.asp?mbrguid={BF2C74EF-A2E4-4DE1-838F-6B35DAA0E099}&projectguid={A09A892D-7D6A-40B8-B8F7-08F2A7921FE6}
UPDATES