Access the Full Project by Clicking here!
Bidjugde
JOB
City Of Beaumount Pine Street 48 inch Water Line
BID DATE
04/27/23 - 2:00
AGENCY
Beaumont
ESTIMATE
n/a
SCOPE
The project will consist of all associated work to install approximately 15,114 linear feet of 48-inch water line and 1,005 linear feet of 42-inch water line along the Pine Street ROW from Colliers Trail to Marina Street. The water line will include air valves, blow-off valves, gate valves, butterfly valves, road crossings, asphalt pavement replacement, traffic control, connections at two locations, a pig retrieval station, and cathodic protection. https://www.civcastusa.com/project/63eea266a8fa96ef523b366d/summary john.pippins@beaumonttexas.gov
UPDATES