Brigham City Forest Street Utility Relocation Road Connection
BID DATE
03/30/23 - 3:00
AGENCY
Brigham
ESTIMATE
$4,800,000
SCOPE
The Project consists of constructing two roads and relocating utilities (sewer, culinary water, storm drain power conduit) in preparation for the installation of an overpass over Forest Street. There will be 852 lf of bored pipes installed, 2,650 lf of culinary water, 3,465 lf of storm drain pipe, and 2,430 lf of sanitary sewer pipe installed. The project also includes preparing and paving new roads, asphalt patching, new curb and gutter, patching curb and gutter, new sidewalk, patching sidewalk, new fencing, and all other work required to render the project complete. karter@jonescivil.com