Access the Full Project by Clicking here!
Bidjugde
JOB
Ina Road Right Turnbays (ST043) and Sidewalk (ST046)
BID DATE
12/23/14 - 2:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
BID DATE CHANGED 12/18: The project can generally be described as an improvement to Ina Road along its eastbound and westbound approaches to Thornydale Road to increase the width of the existing right turn lanes and to add dedicated bicycle through lanes. Elements of the work include removal and replacement of pavement, curb, sidewalk, signage, markings, and handrail. Other corresponding work includes improvements to the stormwater drainage system along the north side of Ina Road from the easternmost driveway into the Gold Canyon Plaza Shopping Center, traffic signal INFORMATION AND INSTRUCTIONS Ina Road Right Turnbays onto Thornydale TO BIDDER Ina Road Sidewalk – Thornydale to Meredith Town of Marana Bid No. 2014-036 RFP Ina Road Turnbays & Page 2 Ina Road Sidewalk 141120 relocations at the northeast and southwest quadrants of the Ina/Thornydale Intersection, and upgrades of existing handicap ramps at the northwest and southeast quadrants of the Ina/Thornydale Intersection to meet current ADA specifications. Additionally, new sidewalk is to be installed along the south side of Ina Road between Thornydale Road and Meredith Boulevard as well as upgrades of existing handicap ramps at all quadrants of the Ina/Meredith Intersection.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT