Access the Full Project by Clicking here!
Bidjugde
JOB
Water Treatment Plant No 1 Improvements
BID DATE
03/28/23 - 2:30
AGENCY
Farmington
ESTIMATE
n/a
SCOPE
The work to be performed under this contract for Water Treatment Plant No. 1 Improvements shall consist of furnishing all labor, equipment, and materials for work to be performed under this contract shall consist of furnishing labor, equipment, and materials necessary to rehab or construct the following: 1- Ferric Injection Manhole Rehab 2- Sedimentation Basin No.1 Wall Concrete Repair 3- Sedimentation Basin No.2 & 3 Concrete Repair 4- Replace East Filter Building Valves 5- Replace West Filter Building Valves 6- Replace Surface Wash Pump in East Filter Building 7- Replace Surface Wash Pump in East Filter Building 8- Repair Water leaks in Concrete in East Filter Gallery 9- Add Cooling Unit for Lab Space in West Filter Building 10- Backwash Supply Pump Station Rehabilitation 11- New Chemical Building 12- Heating, Ventilation, and Air Conditioning System 13- Electrical Rehabilitation 14- Re-painting and Stucco Repair of Building Exteriors 15- Miscellaneous Site Civil 16- Replace Clearwell Pumps in East Filter Building 17- Replace Clearwell Pumps in West Filter Building 18- Flocculation Mixers 19- East and West Filter Building Roof Rehab 20- Rehabilitation of Old Chemical Rooms & Storage Room Roofs 21- Upgrade Interior and Exterior Lighting to LED 22- Demolition 23- New Backwash Wastewater Tank and Pump Station 24- Other items as specified and/or shown on the drawings ksandoval@fmtn.org vv https://fmtn-ebidding.ionwave.net/PublicDetail.aspx?bidID=729&ret=OPEN&pg=0&bidNumber=&title=&type=&org=
PREBID
3/3/2023 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT