Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage Sump Pedestrian Path Improvements On 4th Street From Pico Street To Taft City Limit
BID DATE
03/29/23 - 11:00
AGENCY
Taft
ESTIMATE
$529,348
SCOPE
constructing concrete sidewalk, drive approach, curb, gutter, curb ramp, chain link fence and gate, installing drainage inlet, discharge structure, reinforced concrete pipe and rock slope protection, relocating roadside sign, removing concrete, asphalt concrete pavement, pole, roadside sign and bollards, adjusting frame and cover to grade paving hot mix asphalt, and grading drainage sump Bobbie Pearson,661-862-5114.pw-contracts@kerncounty.com https://www.ebidboard.com/public/projects/showproject.asp?mbrguid=%7B47F30E5A-EB31-43EE-A8CD-59AC6EA9E9BA%7D&projectguid=%7B4E1DAC99-BC22-418D-AA5E-E353F193C481%7D

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT