Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drainage Erosion Control Improvements Various Locations Phase F
BID DATE
03/10/23 - 1:00
AGENCY
Dallas
ESTIMATE
n/a
SCOPE
The proposed contract includes nine (9) different project locations in the City of Dallas. The locations include seven (7) storm drain improvement projects and two (2) erosion control projects. Four (4) of the storm drain projects also involve water and wastewater main replacement. The erosion control projects include construction of gabion walls with varying heights and lengths along different creek banks. The storm drain improvement projects include installation of mains of varying diameters ranging from a 18-inch pipe to 9'x6' reinforced concrete boxes. Water main replacement includes installation of 6-inch to 16-inch diameter pipes. Wastewater main replacement includes installation of 8-inch to 12-inch diameter pipes. Detailed project location and information can be found in the contract specifications.
PREBID
2/17/2023 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT