JOB
Tanglewood Briarwood Phase 1A Street Realignment Dallas Roberson Intersection Fire Station 8 Pressw
BID DATE
03/2/23 - 2:00
AGENCY
Conroe
ESTIMATE
n/a
SCOPE
Mill and overlay of approx. 22,790 SY of asphalt road; approx. 140 LF of road extension and removal of 9,000 SY of asphalt and concrete road; construction of approx. 9,000 SY of concrete, curbed roads; and 2,150 SY of new concrete road for the realignment of a street in the Uptown District including pavement markings, small road sign relocation, water valve and manhole adjustments, and drainage improvements. The project also includes additional work in several areas of the City such as: Mill and overlay 1,200 SY at Southmore Dr.; road widening which includes removal of 480 SY of asphalt and installation of 870 SY of asphalt, drainage improvements, pavement markings, concrete driveway installation, manhole adjustments and small sign relocations at Presswood Rd.; and a driveway repair and installation of a small drainage system at Fire Station 6. https://www.civcastusa.com/project/63e6642128be814778117756/summary
PREBID
2/22/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT