5 Corners District Sidewalks Curb and Restriping project
BID DATE
02/24/23 - 1:30
AGENCY
5 Corners
ESTIMATE
$200,000
SCOPE
Project scope: The project area is generally located inside Beltway 8 in southwest Houston and Harris County. The project limits are located within the City of Houston, and within the approximate rights-of-way of the project streets as stated on the plans along various Major Thoroughfares within the 5 Corners Improvement District. The purpose of these Sidewalk, Curbs, Curb ramps and Restriping project is to: • Remove and replace existing sidewalks and curb ramps as identified by the engineer in the field along Major Thoroughfares • Remove and replace existing concrete curbs as identified by the engineer in the field along Major Thoroughfares • Restriping of lanes along Major Thoroughfares as identified in the plan set and as identified by the engineer in the field. • Traffic Control • Storm Water Pollution Prevention • Tree Protection https://www.civcastusa.com/project/63dd658319f9d0aadb4a815b/summary ckasturi@huitt-zollars.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT