JOB
Magna WRF Reuse MWD Reuse
BID DATE
02/23/23 - 10:00
AGENCY
Magna Water
ESTIMATE
$12,000,000
SCOPE
The Work for the Magna WRF Reuse Project comprises the construction of a new Secondary Reuse Building which includes tertiary filtration equipment and pump station facilities. The new facility will allow for treated water from the WRF to be used within the MWD secondary irrigation system or be discharged to the existing outfall. The Work will generally include the following elements: 1. New 2,900 sq-ft Secondary Reuse Building with a treatment/pump room, electrical room, 127,000 gallon wet well, and lower level dry well. 2. Excavation with high groundwater (dewatering activities). 3. Secondary reuse pump station (3,230 gpm, 650 hp installed capacity). 4. Effluent return pump station (3,230 gpm, 45 hp installed capacity). 5. Purchase and installation of an owner pre-negotiated cloth media filtration treatment equipment system. 6. Chemical metering systems (chlorine and polymer). 7. Concrete splitter box with mixing equipment and chemical injection system. 8. Yard piping, utilities, and civil site improvements. 9. Electrical and Controls. https://magnawater.com/procurement-projects
PREBID
2/2/2023 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT