Access the Full Project by Clicking here!
Bidjugde
JOB
Magnolia Broadway Sanitary Sewer Improvements
BID DATE
03/2/23 - 2:00
AGENCY
Anaheim
ESTIMATE
$496,000
SCOPE
The sanitary sewer improvement work to be undertaken consists of constructing a new 8-inch VCP sewer and abandoning an existing 8-inch VCP inverted sewer siphon within the Broadway roadway in City right-of-way as shown on the contract drawings. The work consists of, but is not limited to, sewer pipeline removal and disposal; construction of new manholes; connection of existing sewers to new manholes; connecting a new sewer to an existing manhole; connection of existing sewer service laterals to the new sewer pipeline; sewer bypassing to maintain sewer service; trench restoration; sheeting, shoring, and bracing; grind and cap paving; replacement of inductive loop detectors and signal conduit; replacement of traffic striping and pavement markers; temporary traffic control measures; adjustments and coordination of adjustment of manhole covers, water valve covers, and gas valve covers; implementation of a Water Pollution Control Program and Best Management Practices; and all appurtenant work as shown on the plans and delineated in the Specifications. The work also includes 2-inch grind and cap asphalt concrete paving for the full width of the Broadway roadway (from southern gutter to northern gutter) as shown on the contract drawings. Traffic striping and pavement markings will be replaced and all SP1-2 utility manhole covers and valve covers will be adjusted to grade as part of the paving work. Lori Ishigo,714-765-4113,lishigo@anaheim.net https://pbsystem.planetbids.com/portal/14424/bo/bo-detail/96626#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT