Access the Full Project by Clicking here!
Bidjugde
JOB
Stewart Creek North Interceptor Phase 4A
BID DATE
02/23/23 - 10:00
AGENCY
Harris County
ESTIMATE
n/a
SCOPE
The project generally includes the construction of approximately 9,870 linear feet of wastewater interceptor ranging from 8 inches to 36 inches in diameter. The proposed interceptor generally flows from Woodstream Drive south of Hickory Street, west along Oakbrook Park, Fossil Ridge Drive, Fifth Street, and Water Stop Way, generally south of Stewart Creek, and ties into the existing wastewater system west of the Burlington Northern Santa Fe railroad. Approximately 1,270 linear feet shall be installed by other than open cut. The Project also includes the installation of approximately 38 new manholes. Pre-bid meeting 2/7/23 Video conference: tinyurl.com/52hbhraa Phone conference: 877-366-1298 Conference ID: 859-427-673 Bid opening Video Conference: tinyurl.com/ms8v8kbk Phone Conference: 877-366-1298 Conference ID: 294-411-633 https://friscotexas.bonfirehub.com/opportunities/84774

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT