Access the Full Project by Clicking here!
Bidjugde
JOB
Cutino Park Improvements Part 2 Phase 1
BID DATE
02/16/23 - 3:30
AGENCY
Seaside
ESTIMATE
n/a
SCOPE
The project includes demolition, tree removal, and earthwork; storm drain pipes, structures, and bioretention pond; concrete curbs, gutters, sidewalks and walkways; site retaining walls; hot mix asphalt paving; site furnishings including drinking fountain, bike rack, benches, and bleachers; play area including play equipment, engineered wood fiber surfacing and poured in place surfacing; and planting and irrigation. pwinfo@ci.seaside.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT