JOB
Rowell Avenue Sidewalk Gap Closure 1st St Curtis Ave Construction
BID DATE
01/31/23 - 11:00
AGENCY
Manhattan Beach
ESTIMATE
$420,000
SCOPE
The Rowell Avenue Sidewalk Gap Closure Between 1st St and Curtis Ave (P-922) is a Public Works construction project to install new sidewalk and ADA ramps in front of Pennekampe Elementary School. The work includes, but is not limited to, constructing 3,800 square feet of 4” thick PCC sidewalk, 6 new ADA curb ramps, 800 linear feet of new variable height curb, 640 linear feet of new variable height curb and gutter, 1,525 square feet new 8” thick PCC cross gutter, 1,060 square feet 8” thick PCC driveway, 52 TN install 6” thick asphalt, 200 LF paint curb, remove and relocate/replace existing handrails, remove and relocate existing chain gate bollards, install city furnished water meter vault including cutting mouseholes, adjust to grade utilities, remove/relocate or replace signs/post, remove crosswalk striping, install new crosswalk striping, install vehicle feedback signs, remove landscape and trees, install landscaping and irrigation, and traffic control measures. Marzena Laskowska/(310) 802-5325 mlaskowska@manhattanbeach.gov https://pbsystem.planetbids.com/portal/48136/bo/bo-detail/100955#bidInformation
PREBID
1/10/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT