WCMUD 38 Phase 1 Detention Basin Excavation Spoil Placement and Outfall
BID DATE
02/8/23 - 2:00
AGENCY
Waller County
ESTIMATE
n/a
SCOPE
Project scope shall include the excavation of 800,000 CY; the installation of the 1,850 LF 24” to 72” RCP storm sewer; 45 LF of 7’x5’ RCB storm sewer; and concrete storm water quality structure. https://www.civcastusa.com/project/63c7062acd859dc11b433a43/summary cborja@ehrainc.com