Storm Drain Rehabilitation FY 2013 2014 Various
BID DATE
12/3/14 - 2:00
AGENCY
Chula Vista
ESTIMATE
$920,000
SCOPE
The scope of work consists of the rehabilitation of storm drain improvements at various location within Chula Vista. Work includes the removal and replacemetn of deteriorated corrugated metal pipe (CMP) with reinforced concrete pipe (RCP), lining existing CMP, removal and replacement of a portio nof an existing box culvert, curb inlets, catch basins, a curb outlet, and cleanouts, curb, gutter, sidewalk, driveway, cross gutters, and a PCC bus pad. The scope also includes pavement striping and markings, traffic control, protection and restoration of existing improvements and other miscellaneous work. Alan Reyes, 619-407-3588 areyes@chulavistaca.gov