Access the Full Project by Clicking here!
Bidjugde
JOB
(PREQUAL) 9th 10th Street Stairs Water Improvement
BID DATE
02/13/23 - 4:00
AGENCY
Park City
ESTIMATE
n/a
SCOPE
The work for the installation of new stairways consists of approximately 350 linear feet of new stairway and landing consisting of wood and metal grates, wood and steel handrail, concrete footings, concrete landing, sidewalk, and approximately 150 linear feet of concrete on-grade stairways, minor excavation, stacked rock wall, and landscape restoration. The work for the improvements to the city water system consists of road construction work and traffic control required to trench in existing roadways and undeveloped rights of way, install new water lines and connect to existing water line with new valves and reducers, installation of cathodic protection on all existing water valves identified on the plans, capping and removing existing waterlines within the rights-of-way and installation of new waterline within the rights-of-way as well as landscape restoration. PCMC is inviting Prequalified Contractors to bid on the replacement and construction of water lines and the construction of stairs in the 9th and 10th Street undeveloped rights of way in Park City, Utah. https://www.parkcity.org/Home/Components/RFP/RFP/14624/2339 michael@alliance-engr.com mtwombly@parkcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT