Vine Street Sidewalk
BID DATE
02/9/23 - 2:00
AGENCY
Tooele
ESTIMATE
n/a
SCOPE
The Project includes the following Work: connecting two existing sections of combination curb, gutter, and sidewalk by excavation, preparation of subgrade, installing and preparing base course, pouring curb and gutter and sidewalk, asphalt paving between the new curb and the existing street, and incidental work. Bids will be received for a single contract. ted.m@jonesanddemille.com
PREBID
2/2/2023 2:00