Access the Full Project by Clicking here!
Bidjugde
JOB
Town of Addison Water Line Upgrades and Wastewater Improvements
BID DATE
02/28/23 - 2:00
AGENCY
Addison
ESTIMATE
n/a
SCOPE
The project consists of constructing approximately 1,020 LF of 8” HDPE (DR 17) wastewater line by pipe bursting, approximately 313 LF of pipe rehabilitation and 1,300 LF of 8” PVC (DR 18) water pipeline by open cut. There will be 5 related new manholes. The new 8” wastewater line will extend north approximately 1,020 LF from the cul-de-sac on Lake Forest Drive to a proposed manhole on the south side of the creek from there the existing wastewater line will be cleaned, inspected and have spin cast epoxy lining applied extending approximately 313 feet north to an existing manhole along Belt Line Road. Approximately 977 LF of proposed water line will be constructed by open cut, in the same location as the existing line with one section offset parallel to the existing line to maintain minimum required distance from the wastewater line and manholes. The water line will extend from the fire hydrant north of the cul-de-sac on Lake Forest Drive to the south side of the creek. Approximately 71 LF of proposed line will be installed under the creek by trenchless methods, bore and jack, and then open cut the remaining approximately 240 feet and tied into the water line along Belt Line Road. All existing water services must remain in service by means of a Bypass Piping System with Temporary Service Connections. Once the new water line is constructed, services will be transferred to the new line. https://www.civcastusa.com/project/63ced47252704f2e8633b94a/summary David.Rankin@decorp.com
UPDATES