Pavement Major Rehabilitation FY 13 14 (Asphalt Overlay)
BID DATE
10/22/14 - 2:00
AGENCY
Chula Vista
ESTIMATE
$3,125,000
SCOPE
The scope of work consists of the pavement rehabilitation of various street pavement locations in the City of Chula Vista, CA. The work includes the removal and replacement of damaged asphalt concrete pavement and the application of asphalt pavement. In addition, a full reconstruction of First Avneue between G Street and H Street will be conducted using the Full Depth Reclamation (FDR) method and a Modular Wetland filtration system will be installed. The work also includes excavation and grading, removal and disposal of existing improvements, installation of AC pavement, weed removal and treatment with herbicide, cold milling, installation and/or repair of curb, gutter, pedestrian ramps, cross-gutter, traffic control, protection and restoration of existing improvements, other miscellaneous work, and all labor, material, equipment and transportation necessary for the project. BETT JUAN, 619-409-3883 bjuan@chulavistaca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT