Access the Full Project by Clicking here!
Bidjugde
JOB
Pressure Reducing Station Replacements Phase 2
BID DATE
03/1/23 - 11:00
AGENCY
Carlsbad
ESTIMATE
$2,900,000
SCOPE
The Carlsbad Municipal Water District is seeking a contractor to provide all labor, equipment and materials to abandon in-place one existing pressure reducing station (PRS), demolish two existing PRSs and construct three new PRSs in precast reinforced concrete vaults; construct 20 LF of 24” steel casing and 2,480 lineal feet (LF) of new 12” polyvinyl chloride (PVC) pipe water main and 160 LF of new 16” fusible PVC pipe water main including isolation valves and fire hydrant, air valve, blow-off and water service assemblies; remove and dispose of existing 12” and 16” asbestos cement pipe (ACP); connect to existing 12” and 16” ACP and 20” cement mortar lined and coated steel pipe water mains; demolish one existing electrical service and construct two new electrical services; construct electrical, instrumentation and communications systems for new PRSs; replace existing asphalt concrete pavements and Portland cement concrete sidewalk, curb and gutter improvements and restore pavement striping, markings and pavement markers. The work shall include all surveying and construction staking, traffic control, utility potholing, storm water pollution control, excavation support systems; pipeline hydrostatic pressure testing and disinfection; and site restoration. https://pbsystem.planetbids.com/portal/27970/bo/bo-detail/101720 Graham Jordan 760-602-2462 graham.jordan@carlsbadca.gov
PREBID
2/7/2023 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT