Access the Full Project by Clicking here!
Bidjugde
JOB
Sleepy Hollow Waterline Improvements
BID DATE
11/25/14 - 2:00
AGENCY
Chino Hills
ESTIMATE
$320,000
SCOPE
he work consists of, but is not limited to, mobilization, traffic control, installation of 12-inch HDPE by horizontal directional drilling method and 12-inch PVC pipe by open trench method on Carbon Canyon Road (SR-142), construction of new PRV facility, remove and dispose of existing PRV facility, abandoning existing 6-inch waterline, trench restoration, and pavement striping. pmontoya@chinohills.org.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT