Access the Full Project by Clicking here!
Bidjugde
JOB
Johnny Carson Park Revitalization
BID DATE
12/9/14 - 2:00
AGENCY
Burbank
ESTIMATE
$3,500,000
SCOPE
This project will modernize Johnny Carson Park, a City Park that has been in service for more than fifty years. Major modernization work last took place in the 1970’s. The existing restroom building will not be modernized but for some electrical, communication and plumbing connections. A major emphasis of the project is to restore the existing stream bed by removing the hard bottom and restoring the stream to a more natural state including replacement of two pedestrian bridges. The stream bed work includes oversight by the Army Corps of Engineers, Los Angeles Regional Water Quality Control Board and California Fish & Wildlife during the limited construction season. Other work includes replacement of the irrigation system, walkways, stage, lighting, water fountains, play equipment, park furnishings, turf, plants and trees. Shade structures will be constructed. The contractor will have to maintain and irrigate existing landscaping during construction. Perimeter concrete and fencing repairs are included in the project. The park will be closed to the public during construction. A MANDATORY pre-bid conference and job walk will be held November 13, 2014, beginning at 10:00 am. Please meet Sean Corrigan, Chief Asst. Public Works Director / City Engineer at the Restroom Building @ Johnny Carson Park, 400 Bob Hope Drive, Burbank, CA 91505 on this date and time. Failure to attend the pre-bid conference will disqualify your bid. Karen Little - 818-238-5466 BurbankPurchasing@burbankca.gov
PREBID
11/13/2014 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT