Access the Full Project by Clicking here!
Bidjugde
JOB
Street Rehabilitation FY 2023
BID DATE
01/31/23 - 2:00
AGENCY
Berkeley
ESTIMATE
$10,200,000
SCOPE
traffic control, environmental protections, adjustment of valve boxes and utility boxes, frames, and covers, replacement of survey monuments, protection of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, valley gutters, drainage, crack sealing, base failure repairs, ARAM cape seal, cold planing, removal and disposal of pavement surfaces and base materials, stabilization, hot-mix asphalt (HMA) and rubberized hot-mix asphalt (RHMA) paving, speed tables, traffic diverter, pavement markings, striping, markers, signage, and traffic loops as specified. https://berkeleyca.gov/doing-business/working-city/bid-proposal-opportunities/street-rehabilitation-fy-2023 WWong@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT