Access the Full Project by Clicking here!
Bidjugde
JOB
Environmental Site Remediation
BID DATE
06/10/15 - 2:00
AGENCY
Los Angeles
ESTIMATE
n/a
SCOPE
The Project consists of excavating and removing chemically-impacted soil; characterizing stockpiles; certifying clean soils to be reused onsite; disposing at offsite treatment/disposal facilities soil that cannot be certified clean; removing light non-aqueous phase liquid (LNAPL) from excavations; placing nutrients at the bottoms of excavations; installing groundwater piping system; backfill and compaction; importing soil that meets the Ports reuse and import fill criteria & the site-specific cleanup goals; performing surveying; performing site grading; & other work as shown on Drawings & described in Specifications. Contract Documents will be available in the Depts Web-based Bid Mgmt System called The Construction Division Business Opportunity Network at www.portoflosangeles Jill Demontagnac jdemontagnac@portla.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT