Access the Full Project by Clicking here!
Bidjugde
JOB
Misc Alley & Sewer Improvements
BID DATE
11/19/14 - 3:00
AGENCY
Brea
ESTIMATE
$1,111,000
SCOPE
Rehabilitation of Alley East of Brea Boulevard and South of Imperial Highway, Project 7307 - This project will reconstruct the asphalt pavement, construct 4-foot wide concrete swale, construct two driveways and replace approximately 1,220 linear feet of 8-inch sewer main in the alley between Brea Boulevard and Orange Avenue from Imperial Highway to Elm Street. Downtown Parking Structure 1 Sewer Line Upgrade, Project 7622 – This project will relocate existing 4-inch storm drain pipe from the trash compactor and connect to the existing sewer main on Walnut Street. Sewer Main Replacement in the Alley west of Brea Boulevard and South of Imperial Highway, Project 7623 - This project will replace approximately 580 linear feet of 8-inch sewer main through pipe bursting method in the alley between Brea Boulevard and Walnut. Hsing Chao Associate Engineer 714.990.7606

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT