Access the Full Project by Clicking here!
Bidjugde
JOB
Mountain Green Sewer Improvement District 2023 BNR Wastewater Treatment Plant
BID DATE
02/21/23 - 3:00
AGENCY
Mountain Green Sewer ID
ESTIMATE
n/a
SCOPE
The Project includes the following Work: • Draining of existing cell #2. • Construction of 6,500 SF Operations Building (Smooth Face CMU). • Construction of 5,000 SF Headworks Building (Smooth Face CMU). • Installation of Biological Nutrient Removal Basin Equipment. • Construction of (2) Clarifiers. • Construction of a Large Digester Split Into (2) Sides. • Electrical, Mechanical HVAC, and Plumbing. • Chemical feed system: Two dual pump skid (4 pumps total), 1/2" tubing, 1/2" sch 80 PVC, 3" conduit, Pressure Gauges, • Construction of Yard Piping including 6”-24” HDPE and Ductile Iron Lines, Sewer, Chemical Lines, Backwash Piping, Sludge Piping, Return Waste Water Lines, and Electrical System Upgrades including on-site back-up generator. • Site Construction including import structural fill, asphalt paving, landscaping, and curb and gutter. • Installation of Mechanical Dewatering System (Screw Press). ihammond@sunrise-eng.com
PREBID
1/24/2023 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT