Access the Full Project by Clicking here!
Bidjugde
JOB
DP Road Phase II Reconstruction
BID DATE
02/29/24 - 2:00
AGENCY
Los Alamos County
ESTIMATE
n/a
SCOPE
DP Road Phase II: Roadway infrastructure and drainage improvements to include removal of existing asphalt surfaces and base material. Re-compaction of subgrade and base material and installation of new asphalt surface. Construction of driveways, sidewalks, curb ramps, and curb and gutters will be completed. Existing streetlighting will be relocated and upgraded with new conduit, arms and fixtures. New storm drain installation to include drop inlets, manholes, median drop inlets, and pond infrastructure. (Roadway Reconstruction: Approx. 2450 feet). • Utilities infrastructure includes installation of a gravity feed Sewer Line and an 8-inch force main sewer line. New lift station and sewer manholes. Replacement of the water (12-inch) and HDPE gas lines (4-inch). Reconnection of services to adjacent properties. Install conduit for electrical power, County fiber, Century Link/Lumen and Comcast. carmela.salazar@lacnm.us lacbid@lacnm.us https://www.losalamosnm.us/government/departments/administrative_services/procurement/bids___r_f_p_s/i_f_b23-29_d_p_road_phase_i_i
UPDATES