La Paloma Subdivision Street Improvements Phase I
BID DATE
10/28/14 - 2:00
AGENCY
Brawley
ESTIMATE
n/a
SCOPE
The Work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications and contract documents. The general items of work include asphalt pavement overlays, adjusting facilities to grade, striping, remove and replace asphalt, and other items not mentioned that are required by the Plans, Drawings and Specifications. The following system will be applied to as shown on the plans and as follows: Grind 2-inch minimum off the asphalt surface from portion of Calle de Valenzuela, apply 1-1/2” overlay on Hontza Court and Milano Court, apply 2” overlay on Avenida de Colimbo and Calle de Valenzuela, and type II slurry on north North Milano Court and Mika Court.