The project includes, but is not limited to, existing 6-in ACP sewer main abandonment in place, relocation & realignment of new 8-inch PVC sewer mains to approximately the center of the street using open trench pipe replacement construction method, sewer lateral extension, realignment & reconnections, sewer manhole installations, existing sewer manhole abandonment, surface restoration, traffic control, mobilization, stormwater control, utility coordination, sewage bypassing, video inspection of the segments, survey referencing and reinstallation of existing survey monuments, and all other work as shown on the Plans and as called for in the Project Specifications and as directed by the Engineer.