Cottonwood Woodrow Vine Street Mill Overlay
BID DATE
01/26/23 - 3:00
AGENCY
Murray
ESTIMATE
n/a
SCOPE
This project includes three payment schedules of collector roads with both 3” and 2” rotomilling, placement of 3” bituminous concrete pavement, and the removal and replacement of PCCP panels. The total quantities are estimated at 423,600 SF of mill (321,800 SF is 3” mill, 37,100 SF is adjacent to railroad), 7,850 Tons of bituminous overlay (690 Tons is adjacent to railroad), and 8,630 SF of PCCP panel replacement. Also included are pedestrian ramp improvements, limited curb and gutter replacement and sidewalk/pedestrian improvements. A portion of mill and overlay will be in the vicinity of UTA and Union Pacific Railroad crossing. Permitting and coordination with the railroad will need to be performed. Travis Neely +1 801-264-2435 tneely@murray.utah.gov