Access the Full Project by Clicking here!
Bidjugde
JOB
Large Potable Water Valve Replacement
BID DATE
11/25/14 - 10:00
AGENCY
Long Beach
ESTIMATE
$1,276,000
SCOPE
The Work involves furnishing all labor, materials, and equipment necessary to remove existing 20 and 36-inch gate valves and associated bypass piping and valves; 36-inch and 48-inch SCC (Steel) pipe; 20” (nom) Cast Iron and CML steel pipe; chlorination assemblies; and associated piping and accessories and replace with new 20 and 36-inch butterfly valves; 20 and 36-inch CML&C pipeline and transition piping; chlorination assemblies; and associated piping, fittings and accessories as necessary to connect and place in service the pipelines and associated appurtenances at Site 1.The Work also involves furnishing all labor, materials, and equipment necessary to remove the existing 20-inch and 30-inch gate valves and associated bypass piping and valves; 20-inch and 30-inch SCC pipe; 20-inch cast iron pipe; chlorination assembly; and associated piping and accessories and replace with new 30-inch butterfly valves; 20-inch and 30-inch CML&C steel pipe; 20-inch butterfly valve; chlorination assemblies; and associated piping, fittings and accessories as necessary to connect and place in service the pipelines and associated appurtenances at Site 2. Eduardo Lomeli - 562-570-2340 Eduardo.Lomeli@lbwater.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT