Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Half Roadway Construction Clayton Road Ethington Road
BID DATE
08/3/23 - 1:00
AGENCY
Casa Grande
ESTIMATE
$3,400,000
SCOPE
AWARD 2/14/23: This scope of work intended is to construct half roadway improvements for the Project. The city is seeking an experienced CMAR to construct half roadway improvements for approximately 5,290 lineal feet (LF) for Clayton Road (north half) between Burris Road and Ethington Road and approximately 5,290 LF for Ethington Road (east half) between Clayton Road and Cowtown Road. The project shall include installation of asphalt pavement, curb and gutter, sidewalk, pedestrian ramps, scuppers/catch basins, retention basins, signing pavement markings and related work for the half street width. The CMAR will work with the designer on constructability. The engineering design team efforts for this project will be performed concurrently with the preconstruction services provided by the selected CMAR. During this phase of the project, the CMAR will be required to actively participate in determining the constructability and cost estimating for the Project. The project's cost estimation shall consist of the determination of design parameters as required to ensure the project can be designed and constructed within budget and deadline constraints. Monir_Zaman@casagrandeaz.gov
UPDATES