Access the Full Project by Clicking here!
Bidjugde
JOB
City of Beaumont 4th Street Roadway Rehabilitation
BID DATE
01/12/23 - 2:00
AGENCY
Beaumont
ESTIMATE
$5,800,000
SCOPE
GENERAL CONSIDERATIONS: The Contractor will perform street rehabilitation on 4th Street as further described in the contract document. SPECIAL CONSIDERATIONS: The work required by these Contract Documents will occur within the boundaries of a residential and heavy commercial area. It is the intent of the City of Beaumont that unfavorable impact by the Contract work, on said business and residences shall be minimized. The Contractor shall notify in writing, at least forty-eight (48) hours prior to beginning work, all businesses and residences which are expected to be affected by said work. Ingress and egress to affected businesses and residences shall be maintained at all times by the Contractor as provided in the plans and Contract Documents. Traffic flow through and around the construction area(s) shall be in accordance with the approved traffic control plan and shall be maintained with as little disruption as possible. Barricades, lights, signs and other traffic control devices shall, on a timely basis, be installed and maintained in accordance with the Texas MUTCD and provisions of these Contract Documents as approved by the Engineer. The Contractor shall work closely with the various utility owners and assure prompt access to their equipment for service or adjustment. The Contractor shall be solely responsible for the coordination of work with any utility owner which may be affected by the work. Additionally, forces of the City of Beaumont, in order to secure the safety, welfare and convenience of the citizens of Beaumont, must provide services on both emergency and normal, continuing basis. Provisions of these services may require City forces to work within or around the construction area prescribed by this project. While it is anticipated that the construction schedule impact induced by the work of the City and utility crews will be minimal, the Contractor, by affixing proper signature to these Contract Documents, agrees to indemnify and hold harmless the City of Beaumont from any and all claims of damage or delay, incurred or alleged to have incurred, in connection with the work of said crews. https://www.civcastusa.com/project/6388f1a3388245a8ecce35f5/summary david.tingle@beaumonttexas.gov
PREBID
12/15/2022 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT