Irrigation Pump Stations Replacement
BID DATE
01/10/23 - 2:00
AGENCY
Gilbert
ESTIMATE
n/a
SCOPE
The Goal of this project is to have new irrigation pump stations built, installed and operating normally. This project should also include 1,400 liner feet of main line conversion to 12” at Crossroads District Park. In addition, the current McQueen pump station has a new 20hp SIMFLO pump that may be utilized in the new pump system design so long as it meets or exceeds the minimum flow requirements specified in this RFP. These should be completed before the summer grow in period. Actual dates subject to change based on availability of parts and work time. https://www.gilbertaz.gov/Home/Components/RFP/RFP/1823/155 dior.chapman@gilbertaz.gov