Access the Full Project by Clicking here!
Bidjugde
JOB
East Side Channel Concrete Repairs
BID DATE
12/28/22 - 3:00 LIVE!
AGENCY
Lake Havasu
ESTIMATE
n/a
SCOPE
This construction project consists of a Base Bid that includes approximately 10,009 square feet of concrete removal and replacement on the East side of the channel. This will be a combined project between the city of Lake Havasu requesting 5377 square feet be removed and replaced per the project description, and the London Bridge Resort requesting 4642 square feet being removed and replaced per the project description, with each entity being held responsible for the work performed on their property. Paths for pedestrian traffic must be kept open at all times for access to every business. Cut joints in all common areas, and hand joined on sidewalk, in front of gift shop and stamped and colored area. This project is to be completed by February 24, 2023. All equipment and product must be supplied by contractor. No concrete trucks on pavers. All concrete must be pumped from above. Smaller end heavy equipment on pavement only. purchasing@lhcaz.gov LIVE: https://bluejeans.com/2330864044?src=calendarLink
PREBID
12/12/2022 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT