Access the Full Project by Clicking here!
Bidjugde
JOB
Phase 1 Water Main Section Replacement
BID DATE
02/2/23 - 4:00
AGENCY
Nogales
ESTIMATE
n/a
SCOPE
The Phase 1 Water Main Replacements Project consists of six sections of pipe replacement: • Western Ave Water Main, Project Number WIW-2022-12 • Goodman Street Water Main, Project Number WIW-2022-04 • Poston Street Water Main, Project Number WIW-2022-21 • La Castellana Water Main, Project Number WIW-2022-10 • Stephenson Street Water Main, Project Number WIW-2022-05 • Baldwin Street Water Main, Project Number WIW-2022-14. New components, materials and equipment for the Phase 1 Project consist of 12,620’ of 8” pressure Class 305 psi DR 14 (C900) polyvinyl chloride (PVC) pipe, 30’ of 4” pressure Class 305 psi DR 14, 38 - 8” gate valves, eleven 8” tapping sleeves with valves, 24 fire hydrant assemblies, 175 residential service connections, and six air relief valves (ARV). All work will take place in accordance with the design drawings, water system notes and City of Tucson standard specifications for waterline construction and will be located within the Nogales, Arizona and will part of the City’s potable water distribution system. agalmada@nogalesaz.gov abarcenas@nogalesaz.gov
UPDATES