Antelope Palomas Road Low Flow Crossing
BID DATE
01/5/23 - 1:30
AGENCY
Yuma County
ESTIMATE
$1,000,000
SCOPE
GENERAL DESCRIPTION: A brief description of the work to be performed includes: • Remove existing asphalt at Hoodoo Wash, White Wing Wash, West Wash, Baragan Wash, and Clanton Wash crossing the Antelope-Palomas Road. • Construction of 8” thick Portland Cement Concrete low flow crossings and concrete cutoff walls at the five (5) washes crossing the Antelope-Palomas Road. • Install 12” thick cut-off walls on the upstream and downstream side of each of the five (5) washes. • Place signing and thermoplastic striping at all washes. • Misc. asphalt paving https://www.yumacountyaz.gov/Home/Components/RFP/RFP/360/663 Jason.giard@yumacountyaz.gov cynthia.baisi@yumacountyaz.gov